Patios

New patio installers, checked for you

Tell us about your new patio in about 60 seconds and we match you with local installers we have checked, free and with no obligation.

Get started

Free, about 60 seconds, no obligation.

Patios: an example of the work
Claymation: a homeowner with a cup of tea, looking at her phone

Before you start

Why it pays to choose carefully

A patio looks simple, which is why it is easy to get wrong. Slabs that rock, weeds in the joints and rainwater running towards the house all come from what is underneath. We check every patio installer before they can reach you, so the levels, the fall and the base are done properly.

The work

What we can help with

  • New patio

    Digging out turf or soil, laying a compacted base and setting slabs with a gentle fall so rainwater runs away from the house.

  • Replacing an old patio

    Taking up the old patio in full and laying a new one on a proper base. Sometimes the old base can be reused, often it cannot.

  • New porcelain patio

    Thin, dense slabs with a clean look. They need careful cutting and the right bedding and joints.

  • Raised or split level patio

    A patio on a slope, with retaining walls or steps. Larger embanking or terracing may need planning permission.

Get started

Free, about 60 seconds, no obligation.

Know before you ask

What changes the cost

The area is the starting point, but preparation is where the time goes. Digging out, taking away the soil and old slabs, and laying a firm base takes longer than laying the slabs themselves, and access matters: if everything has to be carried through the house, the job takes longer.

The slab you choose changes the price. Natural stone, porcelain and concrete differ in cost and in how hard they are to cut and lay, and a pattern with mixed sizes takes longer than a single size. Ask the installer what they will bed the slabs on and how they will fill the joints.

A sloping garden adds the most. Steps, retaining walls and drainage channels all add work, and the installer should explain how they will keep the patio below the damp proof course of the house and falling away from it.

Read the full guide: how much does a new patio cost?

Claymation: a tradesperson holding a sign that says Vetted and recommended by QuoteMy

Checked first, then recommended

What we check

  • Public liability insurancePatio work means heavy slabs, cutting tools and machinery around your house and garden. This covers damage and injury if something goes wrong. We see it before an installer can be matched with you.
  • Checked by a personOur team reads their reviews and approves every business before it can reach you.

Choosing well

How to choose a good one

  • Ask how deep they will dig and what the base will be made of.
  • Ask which way the patio will fall and where the rainwater will go.
  • Ask how they will keep the new surface clear of the house's damp proof course and any air bricks.
  • Check the quote covers removing soil and old slabs, and any cutting around drains and manholes.
  • Look at patios they laid a few years ago, to see how the joints and levels have lasted.
Claymation: a homeowner with her white cat on the sofa, chatting with a QuoteMy checked tradesperson

How it works

Three steps, and you stay in charge.

  1. Tell us the job

    A few quick questions about what you need and where. It takes about 60 seconds.

  2. We match you

    With local trades we have checked who cover your area. Before anyone rings, we send you information about their business, their reviews, and reputation.

  3. They call, you choose

    They talk it through, look at the job and give you a quote. There is no obligation to go ahead.

Questions

Patios: common questions

Do I need planning permission for a patio?

For a house in England, there are no limits on the area you can cover with hard surfaces at or near ground level around the house, apart from the front garden. Significant embanking or terracing to support a patio might need a planning application, and a listed building needs consent for significant works.

Are the rules different for a front garden patio?

Yes. In a front garden, you need planning permission if an impermeable surface covers more than five square metres and the rainwater does not drain to a lawn or border. A permeable surface of any size does not need it.

Do the rules apply to flats?

The permitted development allowances for patios apply to houses, not to flats and maisonettes, which have their own rules. Check with your council.

How do I know if my plans are allowed?

If you are unsure, ask your local planning authority, which is usually your council.

Is it free to use QuoteMy?

Yes. It is free for homeowners and there is no obligation to go ahead with any quote.

Sources: Planning Portal: patio and driveway, planning permission · Planning Portal: paving your front garden, planning permission

Find a trade you can trust.

Tell us about the job and we will match you with trades we have checked.

Get started

Free, about 60 seconds, no obligation.